Dec 2019: Matches RFI to Decadal Survey 2020 * For PUMA-32K we increased the R&D period from 4 to 5 years; * We substantially revised the construction cost estimate for the correlator. First, we recalculated the number of operations/second based on the number of lattice sites needed in FFT correlation mode and additionally developed a new per-operation cost from CHIME / HIRAX and DSA-2000 APC whitepaper numbers; * Costs for operations and science were scaled as percentages of the construction cost based on LSST/HERA-II/CMB-S4/DESI data Jul 2019: Matches PUMA APC Submission to Astro Decadal Survey 2020